Turning the tide – how a leading shipyard achieved more than EUR 60 million in annual improvements and a 900% ROI

June 16, 2026

A leading shipyard within a global industrial group partnered with Mantec to address productivity, cost and profitability challenges. The transformation programme generated more than EUR 60 million in annual improvements and increased productivity by more than 15% through the establishment of effective management systems and organisational capabilities needed to sustain long-term success – all with an estimated 900% return on investment.

Background 

Despite several ongoing improvement initiatives, the shipyard faced significant operational and financial challenges. Productivity levels were below expectations, costs were increasing and management believed substantial untapped potential remained throughout the organisation. 

The company had already invested considerable effort to improve performance, but recognised the need for a more structured approach to accelerate progress and ensure lasting results. Mantec was selected as transformation partner to provide project leadership, challenge existing ways of working and support the organisation in building a stronger operational foundation. 

A comprehensive analysis of the entire operation identified improvement opportunities worth approximately EUR 60 million annually, forming the basis for an ambitious transformation programme. 

Building a structured improvement programme 

Following the analysis phase, a large-scale transformation programme was launched to improve operational performance across the organisation. 

The project was led by Mantec and involved a dedicated team consisting of approximately 20 people, including 10–12 Mantec consultants and eight internal project members. Over a period of nearly 20 months, the team worked closely with management and employees throughout the business to design, implement and sustain improvements. 

The programme combined operational excellence initiatives, leadership development and organisational redesign. Key activities included: 

  • Management team workshops and leadership training across all organisational levels  
  • Process mapping and optimisation within production, purchasing, logistics and support functions  
  • Development of a structured management control system with clear KPIs and goal deployment  
  • Daily performance management and coaching  
  • Training programmes for managers, supervisors and operators  
  • Cross-functional workshops focused on collaboration, customer-supplier relationships and organisational development  

Close cooperation between management, operational teams and employee representatives ensured strong commitment throughout the transformation. 

Strengthening organisational capabilities 

Several important organisational changes were implemented during the programme. 

A dedicated logistics function was established with clear responsibility for planning, material flow and transportation activities. This improved coordination across the operation and created end-to-end visibility of the supply chain. 

The quality department was redesigned and integrated more closely into daily operations, leading to improved production quality and stronger accountability within operational teams. 

The engineering and planning functions were also reorganised to support a more project-oriented way of working and strengthen coordination between departments. 

To ensure long-term sustainability, internal project members gradually assumed key roles within the new organisation and continued driving improvements after the programme had concluded. 

Results 

The transformation delivered results that exceeded the original targets. 

Annual improvements surpassed EUR 60 million, while the overall programme generated an estimated return on investment of approximately 900%. 

In addition to the significant financial impact, the organisation achieved substantial operational and cultural improvements: 

  • Productivity increased by more than 15%  
  • Employee absence was significantly reduced  
  • Leadership practices and accountability improved throughout the organisation  
  • Cross-functional collaboration and flexibility increased  
  • Customer-supplier relationships between departments were strengthened  
  • Core processes were documented, standardised and optimised  
  • A structured management control system with KPIs and goal deployment was implemented  
  • Communication and cooperation between functions improved considerably  

The project also created a stronger culture of continuous improvement and a greater organisational willingness to embrace change. 

Creating a platform for continuous improvement 

One of the most valuable outcomes was the establishment of a shared understanding of performance, leadership and operational excellence across the organisation. 

By combining operational improvements with capability building and leadership development, the company not only exceeded its financial objectives but also created the structures, behaviours and management systems required to sustain improvements over time. 

As the client concluded after the project: 

“Mantec’s consultants have been competent and, together with our internal project members, contributed to achieving more than the ambitious goal originally set for us. Cooperation has been good on all levels, including with the unions.” 

If you want to strengthen your operational core, improve delivery performance, and build a scalable foundation for growth, Mantec can help.

Contact us for a free 45-minute consultation:

Denmark – Bent Hansen
bent.hansen@mantec.eu
+45 20 91 46 36

Finland – Eero Vuorensola
eero.vuorensola@mantec.eu
+358 40 54 45 200

Sweden – Göran Svensson
goran.r@mantec.eu
+46 70 631 86 18

Norway – Jan Erick Olsen
jeolsen@mantec.eu
+47 922 68682

Other countries – Kjetil Barfelt
kjetil.barfelt@mantec.eu
+47 913 13 131

Want to know more?