Background
The company works mainly in the graphical sector with both domestic and international customers, and faces very high demand on delivery precision and quality. A shrinking market for volume products with high margins had put pressure on the company to focus on cost savings and achieve a higher operational efficiency, and it turned to Mantec for assistance.
Mantec performed a pre-study and identified three potential improvement areas.
Management system — the existing system was made up of a large, diverse set of follow-up and ad-hoc reports, which were infrequently followed up and lacked methods for deviation handling.
Planning — there was no planning function. A main plan had never been prepared, capacity planning had not been carried out with accurate data, and no detailed planning tools were in place to help rectify these deficiencies.
Productivity/machine utilization — there were various ways in which productivity could potentially be increased – for example by increasing staff utilization, or by working with shorter set-up times.
Implementation
To tackle the problems identified during the pre-project stage, Mantec and the client formed a project with three focus areas: management system, planning process and machine utilization. An active participation from different levels in the organisation was important to anchor decided solutions and routines, which arose from work carried out in sub-project groups with clear goals and time plans.
Management system
A number of elements were put in place to enhance the existing management system:
Planning process
A brand new planning process was developed:
Machine utilization
A number of changes were made to increase flexibility and machine utilization:
Results
The main benefits to the client of following through on the indicated change process have been:

Background
The company is the leading general equipment rental company in the Nordic countries and in Central and Eastern Europe. A major part of its customer base is within the construction sector, but it also includes installation companies, industrial plants, shipyards, and national and local authorities. The company had experienced a rapid growth in turnover, and consequently increased employee numbers – but it did so without developing processes, procedures, management control systems, or key performance indicators (KPIs). There are approximately 300 employees in the business unit considered.
Implementation
During an initial analysis, ManTec evaluated business practices, carried out statistical and operational studies, and discovered that potentially significant improvements could be reached through:
Results
Successful implementation of the project means that the client is now able to:
By the end of the project the client was fit for the future, with an improved culture and a more structured approach to business. Overall, savings equated to €1.3 million.


Background
The company is a geographically diversified group, being the market leader in eight countries in central and northern Europe, where they have
700,000 customers and 4,000 employees.
In spite of good financial results during recent years, the group-management saw potential for improving both the productivity and the quality of work in their “back office” operations, specifically in the operational core processes – customer service, order entry, service production and database management.
The overall objective of the project was to create a better and more cost effective platform for the future development and competitiveness of the group. The company also wanted to develop an internal “efficiency expert group” to support their future internal productivity and quality-related development work.
Implementation
The process started with a pre-study conducted by Mantec. The potential for productivity improvements was identified and an implementation plan was developed in close cooperation with management. Operational and financial goals for the implementation programme – equal to a productivity improvement of 20% –were defined.
The implementation processes started simultaneously in all countries and local processes were supported by a Pan European benchmarking programme, which allowed comparison of performance between the back offices, and helped to identify and share best practices. Key measures implemented during the project were:
During the implementation process, Mantec were able to work closely with company management and personnel to establish a common platform for back offices managers and a “mindset” for continuous operational improvement.
Results
At the end of the ten month implementation process, the operational improvements were evident. The major results of the project were: